Secure your plant start-up: zero maintenance OPEX for 12 months - Request it when you finalize your Controlled Environment project this half-year, and we will cover 100% of the first-year preventive maintenance plan. Guaranteed uptime and regulatory compliance.Secure your plant start-up: zero maintenance OPEX for 12 months - Request it when you finalize your Controlled Environment project this half-year, and we will cover 100% of the first-year preventive maintenance plan. Guaranteed uptime and regulatory compliance.
High Containment Rooms

Controlled Environments

High Containment Rooms

BSL-2/3 · HPAPI OEB 4–5 · Dual protection

BSL-2/3 biological containment and HPAPI handling with dual product and operator protection.

In detail

There are environments where protecting the product from its surroundings and protecting the surroundings from the product are the same problem. Our high containment rooms integrate primary containment equipment, secondary containment architecture and validatable documentation within a single project scope: BSL-2 and BSL-3 biological containment, HPAPI handling up to OEB 4–5, chemical intermediates that simultaneously demand operator protection and product purity.

Engineering scope: directional HVAC, HEPA filtration on exhaust, differential pressure monitoring with alarms, effluent decontamination where the agent requires it. WHO Laboratory Biosafety Manual, 4th ed. (2020), Directive 2000/54/EC, ISO 35001:2019+A1:2024. HPAPI containment documented to ISPE OEB classification and SMEPAC testing. Direct experience in ATEX projects for pharmaceutical applications with solvents.

Completed Projects

High-containment R&D facility

ChileLife Sciences and Healthcare
01/04